This slide presentation outlines information on comparing standard monitoring programs (SMP) and modeling system-specific studies (SSS) for Stage 2 DBP site selection. The objectives of this effort were to: determine sites as if SMP (every 60 days);determine sites as if SSS (one sampling);determine "true" sites (monthly monitoring); and, compare results of SSS and SMP. Topics covered include: Greater Cincinnati Water Works (GCWW) system overview; model requirements for initial distribution system evaluation (IDSE); selecting potential Stage 2B Sites; and, performing the IDSE - SSS: using sample data.
Product Details
Edition: Vol. - No. Published: 06/17/2004 Number of Pages: 32File Size: 1 file , 7.8 MB